AFP - Lot 137

Lot n° 137
Go to lot
Estimation :
400 - 600 EUR
AFP - Lot 137
AFP Construction of the Aswan Dam. Egypt, 1965. Construction of the Aswan Dam. Egypt, 1965. Silver print on baryta paper, from digital file (black and white lambda print). Dry AFP stamp in lower right margin. Stamp "AFP 5/11/2022 Edition Spéciale N°: 1/1" on verso. Gelatin silver print on baryta paper, from digital file (black and white lambda print). Blind stamp AFP in the lower right margin. Stamp " AFP 5/11/2022 Edition Spéciale N° : 1/1 " on verso. Image : 37 x 56 cm - 14.6 x 22 in Paper : 50 x 60 cm - 19.7 x 23.6 in The construction of the Aswan High Dam, initiated by Gamal Abdel Nasser, was intended to control the flow of the Nile, supply Egypt with electricity and increase the country's arable land by a third. The project, partly financed by Russia, began in 1960 and the dam was inaugurated in 1971, the year after President Nasser's death. The construction of the Aswan High Dam, initiated by Gamal Abdel Nasser, aimed to control the flow of the Nile, supply Egypt with electricity and increase the country's arable land by one third. The project, financed in part by Russia, began in 1960 and the dam was inaugurated in 1971, the year after the death of President Nasser.
My orders
Sale information
Sales conditions
Return to catalogue